DESIGN CAPABILITY
Cad/cam technology was introduce to improve productivity.
Plastic molding plant and sheet metal press molding plant were built,
and equipped with vary modern automatic machines.
The integrated manufacturing processes have effectively reduced the lead
time, and provide customers with best products and most satisfactory
services.
CAE Injection Simulation
1. Mold filling/pack Analysis
2. Mold Cooling Analysis
3. Stress Analysis
4. Warp Analysis
Software:
Uni Graphics x 2 sets
Power Mill x 6 sets
Master CAM x 2 sets
UniGraphics x 6 sets、
AutoCAD x 7 sets、
CATIA x 2 sets

Lead time from mold design to 1st trial
Grille:2 ~ 2.5 Months
Bumper:3 ~ 3.5 Months
Instrument Panel:4 ~ 4.5 Months
 |